Photo Gallery
Check back soon for more photos.
Electrical Installation Project (land facility):
Pneumatic Master Control Panel Installation (offshore production
platform):
One of many modular "works-in-a-drawer" well control panels
during load-out:
Production Platform Revamp/Upgrade Project (Port of Iberia, LA):
Chemical Injection Skid during function test:
Subsea Well Panel:
Topsides Umbilical Termination Assembly:
Drilling Choke Console:
30,000 psi Rated Test Cell Control System (fully automated)
